GOYDER SOUTH STAGE 1 TO POWER OLYMPIC DAM
We have signed a 70 MW renewable energy baseload contract with BHP to supply power its Olympic Dam operations from July 2025.
We will combine output from Goyder South Stage 1 and our Blyth Battery to deliver a 24/7 green energy solution to the mine, along with associated large-scale certificates (LGC).
Read the media release here.